Skip to main content
Assigners — Powered by Quality Score LLC
In-Ground Swimming Pool Construction

Concrete vs. Fiberglass Pools

Concrete (gunite) pools offer full custom shape flexibility at a higher cost and longer build time, while fiberglass pools are pre-formed, faster to install, and typically less expensive.

Contact for price

It’s free, with no obligation to hire.

By submitting, you agree to be contacted by phone, text, or email about your project, including by automated means, even if your number is on a do-not-call list. Consent is not a condition of purchase. See our Privacy Policy and TCPA Compliance page for details.

Assigners — Powered by Quality Score LLCAssigners Commitment

Your request is only shared with a service provider matched to your project and service area — never sold as part of a bulk or resold list.

Concrete/Gunite Pool

$50,000$100,000+installed (illustrative)

Built on-site with a sprayed concrete shell, allowing full customization of shape, size, and features.

Pros
  • Fully customizable shape and size
  • Can be built to any size within the property's constraints
  • Widely available finish and tile options
Cons
  • Significantly higher cost
  • Longer construction timeline (often several months)
  • Surface can be more prone to algae without proper maintenance

Fiberglass Pool

$35,000$65,000installed (illustrative)

A pre-manufactured shell delivered to the site and installed, offering faster installation in standard shapes and sizes.

Pros
  • Faster installation, often just a few weeks
  • Smoother surface that resists algae growth
  • Generally lower total cost than concrete
Cons
  • Limited to manufacturer's pre-set shapes and sizes
  • Shell size is limited by transportation constraints
01 The Verdict

Which one makes sense for you?

Fiberglass pools generally cost less and install faster, in standard pre-set shapes. Concrete pools cost significantly more and take longer to build, but offer complete design flexibility for a fully custom shape and size.

02 What Affects Cost

Key cost factors.

  • Desired pool shape and size customization
  • Site access for large equipment or shell delivery
  • Timeline expectations
  • Long-term maintenance preferences
03 Questions To Ask

Before you decide.

  • What's the expected total timeline from contract to first swim?
  • What's the warranty on the pool shell specifically?
  • What ongoing maintenance does each option typically require?
04 FAQ

Frequently asked questions.

Which pool type requires less maintenance?

Fiberglass's smoother, non-porous surface is often cited as more algae-resistant, which can mean somewhat lower ongoing chemical and cleaning maintenance compared to concrete, though both require regular pool care.

All figures on this page are illustrative examples for general education, not quotes, appraisals, or guarantees of actual pricing. Actual costs vary by provider, location, project scope, and market conditions — always get a specific quote before making a purchasing decision.

Next StepAssigners

Selling in home services?

Talk to our sales team about sourcing exclusive, real-time leads, warm transfers, and inbound calls.

Get Started

We typically respond within one business day.